Key facts: Structural Drying in Uptown and Edgewater
Stacks
Drying the whole stack
The ceiling of one unit and the floor of the next are one assembly. Drying one side leaves moisture trapped. A single plan covers every wet unit from the fire floor to the basement, with access arranged for units whose residents are away.
Plaster and wood
Old plaster and hardwood
Plaster and old hardwood dry slowly. Controlled dehumidification and gentle warmth protect them from cracking and splitting. Daily readings guide adjustments [1].

Basements
Basements and garden units
Basements and garden units collect the water. Finished walls come out so masonry can dry. The boiler room is checked before heat is restored.
Checklist
Drying checklist for a stacked building
- Dry standards set for each material
- Moisture map from fire floor to basement
- Access to every wet unit
- Heat or pipe protection in winter
- Daily readings shared
Towers
Concrete slabs in towers
In towers, water sits on concrete slabs under flooring. Flooring is often lifted so the slab can dry; leaving it traps moisture for weeks.
Winter
Cold-weather drying
If the central boiler is off in winter, temporary heat or desiccant dehumidifiers keep drying going while the plumbing is protected.
Lead
Opening walls safely
When walls must be opened in pre-1978 buildings, lead-safe practices apply [4].
Power
Powering equipment
Equipment runs only from circuits confirmed safe, or temporary power, coordinated with the building.
Mold
Checking afterward
Check closets and basements a few weeks later. EPA advises professional help for larger mold areas [2].
Records
The drying log
Daily readings and photos help the building's insurer and each household's insurer [5].
Six-flats
Drying a six-flat after a fire
In a six-flat, water from the top floor on one side soaks the floor assemblies down that side to the basement. Equipment goes into each wet unit and the basement at once. Plaster ceilings in the lower units are checked for sagging and drained if needed. The central stair, if water ran down it, is dried too.
Readings are taken daily in plaster, wood and masonry, and equipment is moved as areas reach their dry standard.
Courtyard buildings
Drying a courtyard building stack
In a courtyard building, water usually stays within the affected entry's stack. Drying covers those units and the shared basement. Units in other entries are checked to confirm they stayed dry.
Contents
Belongings and drying
Furniture against wet walls blocks airflow. Belongings are moved to the center of rooms, raised on blocks or packed out. Wet papers and photos are dried or frozen.
Choosing a crew
Questions for a drying contractor
Ask how they set dry standards for plaster, wood and masonry, how often readings are taken, whether every wet unit is on one plan, and how equipment will be powered safely. Ask for the daily log in writing.
Timeline
A typical drying job
Day one: extraction, removal of wet finishes and setup in every wet unit. Then daily readings and adjustments, with equipment concentrated where readings stay high. Plaster and masonry usually set the pace.
Power
Powering equipment in a damaged building
Drying equipment draws a lot of power. In a building where the fire affected the electrical system, equipment runs only from circuits an electrician has confirmed safe or from temporary power. Coordinate with the owner and management, especially when equipment runs in several units at once.
Mold watch
Checking for mold after drying
A few weeks after equipment leaves, check closets on exterior walls, under sinks and the basement. A musty smell suggests moisture stayed somewhere. EPA advises fixing moisture problems and drying quickly, and professional cleanup for larger areas [2].
Proof
Keeping the drying record
Keep the moisture map, readings and photos. They show insurers the building was dried properly and answer questions from future buyers or inspectors about past water damage.
Hardwood
Drying hardwood floors over plank subfloors
Many older units have hardwood strip floors over plank subfloors on wood joists. Water from above soaks all three layers. Floor drying mats pull moisture up through the boards while dehumidifiers dry the air. Refinishing waits until boards, subfloor and joists all read normal, or the floor will move again after sanding.
Baseboards
Why baseboards and lower walls are opened
Removing baseboards lets air reach the bottom of the wall and the floor edge, where water collects. Small holes behind the baseboard line let dry air into the wall cavity without large openings. Baseboards can usually be reinstalled afterward.
FAQ
Uptown and Edgewater drying questions
Why must units above and below be dried together?
They share the floor assembly; drying one side traps moisture.
How long does drying take?
Often days to two weeks, longer for plaster and in winter.
Why lift flooring in my condo?
Water trapped on the slab dries very slowly under flooring.
Can drying continue without building heat?
Yes, with temporary heat or desiccant units.
How do I know my unit is dry?
Dry readings from the same material are the target; the job ends when wet areas match them.
Will drying crack plaster?
That is why crews control the pace of drying.
Is Rogers Park covered as well as Uptown and Edgewater?
Only 60640 and 60660 are listed for drying work. Rogers Park, beyond Devon Avenue, is not among the covered ZIP codes.
Does the central stair need drying?
If water ran down it, yes. Stair walls and treads are dried along with the units.
Can I stay in my unit while it dries?
You can, in some cases. The machines run day and night and are loud, so plenty of people move out for the first few days.
Can drying equipment run in several units at once?
Yes, if circuits are confirmed safe or temporary power is used, coordinated with the building.
How will I know if mold is growing?
A musty smell or spots on walls a few weeks later. Report it to the contractor promptly.
Can my hardwood floors be refinished right after drying?
They should rest at normal moisture first, so they do not move again after sanding.
Why does drying make the unit warm?
Dehumidifiers release heat as they work, and warmer materials give up moisture faster. Crews balance it so plaster and wood are not dried too aggressively.
Who arranges drying for my unit if I rent?
The building owner normally arranges drying of the structure. Your belongings fall under your renter’s insurance.
Do I need to empty my unit before drying?
Wet belongings and anything blocking airflow should be moved, packed out or set aside for the adjuster.
Will drying crack my plaster?
Controlled drying is designed to prevent that by avoiding high heat and drying plaster slowly with daily readings.
How do I know my unit is dry?
Once wet materials read the same as dry ones of the same type.
Sources and citations
- [1]IICRC — ANSI/IICRC S500 Standard for Professional Water Damage Restoration
- [2]U.S. EPA — A brief guide to mold, moisture and your home
- [3]Wikipedia — Uptown, Chicago
- [4]U.S. EPA — Lead Renovation, Repair and Painting Program
- [5]Illinois Department of Insurance — What to do after an insured homeowners loss